蚌埠电厂二期工程两台机组为660MW超超临界二次再热汽轮发电机组,为安徽省内供电.受"西电东送"和光伏影响,区域内用电量峰谷差较大,同时电网"两个细则"考核均要求机组具备灵活可靠的调峰能力.经安徽电科院认证和实践表明,蚌埠电厂二期两台660MW超超临界机组具备30%BMCR深度调峰能力.
The two units of the second-phase project of Bengbu Power Plant are 660 MW ultra-supercritical secondary reheat turbine generator units,which provide power for Anhui Province.Affected by the"West-to-East Electricity Transmission"and photovoltaics,the peak-valley difference in power consumption in the region is large.At the same time,the assessment of the"two rules"of the power grid requires units to have fl exible and reliable peak-shaving capabilities.The certifi cation and practice of Anhui Electric Power Academy show that the two 660 MW ultra-supercritical units in the second phase of Bengbu Power Plant have 30%BMCR deep peak shaving capability.
出处
《电力系统装备》
2020年第8期62-63,共2页
Electric Power System Equipment
关键词
深度调峰
低负荷
稳燃
协调控制
deep peak shaving
low load
stable combustion
coordinated control