摘要 吕梁三泉焦化工业园区污水处理厂率先采用A^2O/高压脉冲电絮凝/高密度澄清池/臭氧-活性炭滤池/超滤/反渗透组合工艺处理焦化废水。该组合工艺设计紧凑,技术先进,处理效果好。在废水处理量为9550 m^3/d,进水COD、氨氮、SS、电导率、浊度、总硬度、Cl-平均浓度分别为574 mg/L、44.2 mg/L、275 mg/L、5600μS/cm、146 NTU、210 mg/L和740 mg/L时,系统出水所有指标均远优于《工业循环冷却水处理设计规范》(GB/T 50050—2007)规定的再生水水质标准,并全部实现达标回用。本工程直接运行费用合计为4.47元/m^3。 A combined process composed of A^2O/high voltage pulse electrocoagulation/high density clarification/ozone-activated carbon filter/ultrafiltration/reverse osmosis was adopted in a coking wastewater treatment plant located in Lüliang Sanquan Coking Industrial Park.The combined process had advantages of compact design,advanced craft and perfect treatment effects.During operation of the combined process,the inflow wastewater was 9550 m^3/d.As the water quality parameters of the influent were as follows:COD,574 mg/L;NH^+4-N,44.2 mg/L;SS,275 mg/L;EC,5600μS/cm;turbidity,146 NTU;total hardness,210 mg/L;and Cl^-,740 mg/L.Correspondingly,the effluent of the combined process was better than the standard of reclaimed water quality specified in the Code for Design of Industrial Recirculating Cooling Water Treatment(GB/T 50050-2007).The direct operating cost was 4.47 yuan/m3 in this project.
作者 杨少斌 刘志轩 YANG Shao-bin;LIU Zhi-xuan(School of Energy and Architecture Engineering,Xi’an Aeronautical University,Xi’an 710077,China;China Railway First Survey and Design Institute Group Co.Ltd.,Xi’an 710043,China)
出处 《中国给水排水》 CAS CSCD 北大核心 2020年第6期60-64,共5页 China Water & Wastewater
关键词 高压脉冲电絮凝 焦化废水 再生水 high voltage pulsed electrocoagulation coking wastewater reclaimed water
  • 相关文献

参考文献6

二级参考文献100

共引文献100

同被引文献14

引证文献1

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部