期刊文献+

高速铁路建设铺轨基地选址研究 被引量:3

Research on Tracklaying Base Location of High-Speed Railway Construction
在线阅读 下载PDF
导出
摘要 高速铁路较一般铁路桥隧占比大,铺轨基地便线接入困难,如何合理地选择铺轨基地对于高速铁路建设显得更为重要。本文以某新建高速铁路工程为依托,根据其线路工点分布及现场情况,拟选出三个方案进行比较,从技术经济合理性和施工便利性的角度推选出一个最优方案。 The high-speed railway has a larger bridge and tunnel proportion than the general railway,which is difficult to connect to the railway base. How to choose the railway base reasonably is more important for high-speed railway construction. This paper is based on a new-built high-speed railway project;three schemes are selected for comparison according to the distribution of work sites and site conditions,which then selects an optimal scheme from the perspective of techno-economic rationality and construction convenience.
作者 周先虎 Zhou xian hu
出处 《铁路工程技术与经济》 2020年第2期29-31,40,共4页 Railway Engineering Technology and Economy
关键词 高速铁路 铺轨基地 方案比较 技术经济合理性 High-speed Railway Tracklaying Base Scheme Comparison Techno-economic Rationality
  • 相关文献

参考文献2

二级参考文献6

共引文献17

同被引文献14

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部