摘要 基于目前超高层建筑每层施工的时间越来越短的情况,缩短施工周期有利于加快工程进度,以及施工材料的周转,提高施工企业效益,然而施工周期缩短将导致混凝土强度还没达到100%就要将模板拆除,将加大楼层承担的最大施工荷载,对结构安全带来不利影响,通过理论计算分析以及工程实例对大跨梁的受力情况进行论证。 Based on the fact that the construction time of each floor of ultra-high-rise buildings is getting shorter and shorter,shortening the construction cycle is conducive to accelerating the progress of the project,as well as the turnover of construction materials,and improving the efficiency of the construction enterprise.However,shortening the construction cycle will cause the strength of the concrete to reach 100%the formwork will be dismantled,which will increase the maximum construction load on the floor,which will adversely affect the structural safety.The theoretical analysis of the calculation and the engineering examples will be used to demonstrate the behavior of the long-span beam.
作者 梁晓鹏 Liang Xiao-peng
出处 《建筑技术开发》 2020年第4期122-124,共3页 Building Technology Development
关键词 大跨度 拆模 荷载 计算 分析 long-span demoulding load calculation analysis
  • 相关文献

参考文献4

二级参考文献11

  • 1徐芝纶.弹性力学(上册)[M].北京:高等教育出版社,1986..
  • 2刘鸿文.材料力学:上册[M].北京:高等教育出版社,1993..
  • 3GB50204-1992.混凝土结构工程施工及验收规范.[S].,..
  • 4GBJ9-87.建筑结构荷载规范.[S].,..
  • 5.GB 50010-2002混凝土结构设计规范[M].北京:中国建筑工业出版社,2002..
  • 6GB50009-200建筑结构荷载规范
  • 7建筑结构静力计算手册.北京:中国建筑工业出版社,1978,10
  • 8GBJ10-89混凝土结构设计规范.北京:中国建筑工业出版社,1990,4
  • 9GBJ10-89混凝土结构设计规范条文说明.辽宁科技出版社,1990,4
  • 10清华大学结构力学教研组.结构力学[M]人民教育出版社,1979.

共引文献11

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部