在2000 m2双曲线形冷却塔工程施工过程中,为保证施工人员能从作业面安全上下,采用了超高钢管脚手架上人通道。超高钢管脚手架上人通道安全风险大,稳定性较差。介绍了超高脚手架平面布置、连墙装置、缆风绳设置、脚手架搭设拆除要点,实践证明是可行的。
In the construction process of the 2000 m2 hyperbolic cooling tower project,in order to ensure that the construction workers can safely get up and down from the working surface,the super-high steel scaffolding pedestrian passage is adopted.The superhigh steel pipe scaffolding has a large safety risk and poor stability.This paper introduces the super-high scaffolding plane layout,wallconnecting device,cable wind rope setting,scaffolding detachment points,which proved to be feasible.
出处
《建筑技术开发》
2020年第4期77-78,共2页
Building Technology Development
关键词
双曲线冷却塔
超高脚手架
上人通道
连墙装置
缆风绳
hyperbolic cooling tower
super-high scaffold
upper passage
wall installation
cable rope