低含水率粉细砂地层隧道化学注浆超前支护技术研究 被引量:3

Research on Chemical Grouting Advance Support Technology of Silty Sand Tunnel with Low Moisture Content
在线阅读 下载PDF
导出
摘要 以新建京张铁路草帽山隧道为工程背景,针对隧道洞身上半断面为低含水率粉细砂地层的段落,开挖后拱顶漏砂、掌子面流沙、隧道成洞能力极差的难题,展开粉细砂地层隧道化学注浆超前支护技术研究。 Taking the Caomaoshan tunnel of the newly built Beijing to Zhangjiakou Railway as the engineering background, aiming at the section with the upper half section of the tunnel body in the low water content silty sand stratum, the problems of sand leakage on the arch crown, quicksand on the face of the tunnel and the poor ability of the tunnel to form the tunnel after excavation, the advance support technology of chemical grouting for the tunnel in the silty fine sand stratum is studied.
作者 周云定 程坤 ZHOU Yun-ding;CHENG Kun(Sinohydro Bureau 7 Co.Ltd.,Chengdu 611730,China)
出处 《工程建设与设计》 2020年第5期120-121,145,共3页 Construction & Design for Engineering
关键词 低含水率 粉细砂地层 化学注浆 low moisture content silty sand layer chemical grouting
  • 相关文献

同被引文献22

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部