后浇永久柱半逆作法技术应用研究 被引量:2

Research on Application of the Technology of the Semi-reverse Construction Method of the Rear-pouring Permanent Column
在线阅读 下载PDF
导出
摘要 针对南宁市某酒店深基坑项目所处的复杂环境及地质特点,设计采用后浇永久柱半逆作的基坑支护技术。该技术地下连续墙“两墙合一”、内支撑与梁板结构全面结合、基坑周边逆作中间顺作且逆作部分结构柱后浇。与常规逆作法相比,具有安全性更高,施工速度更快,无需拆除支撑、无需设置地下室结构预制柱、造价低等优点,对类似工程具有一定的参考意义。 Aiming at the complex environment and geological characteristics of a hotel deep foundation pit project in Nanning,a foundation pit support technology using semi-inverted post-cast permanent columns is designed.Underground continuous wall of this technology is“two walls in one”,the internal support is fully integrated with the beam and slab structure,the perimeter of the foundation pit is reversed and the middle is cut,and some of the structural columns are reversed cast.Compared with the conventional reverse method,it has higher safety,faster construction speed,no need to dismantle support,no need to set up prefabricated columns in the basement structure,and low cost.It has certain reference significance for similar projects.
作者 莫杜毅 黄云飞 郑述芳 Mo Duyi;Huang Yunfei;Zheng Shufang(Guangdong Foundation Engineering Group Co.,Ltd.Guangzhou 510620,China;Guangxi University Xingjian College of Science and Liberal Arts Nanning 530005,China)
出处 《广东土木与建筑》 2020年第2期78-80,共3页 Guangdong Architecture Civil Engineering
关键词 深基坑 后浇柱 半逆作法 边逆中顺 全面结合 地下连续墙 deep foundation pit rear-pouring column semi-reverse construction method peripheral reverse construction and intermediate construction full integration diaphragm wall
  • 相关文献

参考文献11

二级参考文献52

共引文献137

同被引文献8

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部