吕家坨矿洗煤厂老主井卸煤系统改造分析 被引量:2

Analysis of Coal Unloading System Reform in Old Main Shaft of Lvjiatuo Coal Washing Plant
在线阅读 下载PDF
导出
摘要 近年来,由于吕家坨矿井煤层、煤质及回采工艺的改变,堵仓、水煤及次生事故已成为老主井卸煤环节的典型问题。本文通过系统分析和方案论证,实施了储煤仓结构优化、给煤设备升级及附属设施完善等技术改造。此次改造有效地提升了老主井卸煤系统的稳定性和生产效率。 In recent years,due to the change of coal seam,coal quality and stoping technology in Lvjiatuo mine,blockages,water-coal and secondary accidents have become the typical problems of coal unloading in the old main shaft.Through system analysis and program demonstration,the paper carried out the optimization of coal storage structure,upgrading of coal equipment and improvement of ancillary facilities.The modification effectively improves the stability and production efficiency of the coal unloading system in the main shaft.
作者 赵文浩 Zhao Wenhao(Lvjiatuo Coal Washing Plant of Coal Washing and Processing Center,Kaili Energy&Chemical Co.,Ltd.,Tangshan 063107,China)
出处 《中国资源综合利用》 2020年第1期100-102,共3页 China Resources Comprehensive Utilization
关键词 卸载系统 问题分析 改造方案 unloading system problem analysis retrofit scheme
  • 相关文献

参考文献1

二级参考文献2

共引文献1

同被引文献17

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部