期刊文献+

基于Pareto改进VNS-MMAS的定点修理任务多目标动态调度 被引量:6

Multi-objective dynamic scheduling of fixed-point repairing tasks based on Pareto improved VNS-MMAS
在线阅读 下载PDF
导出
摘要 针对战时定点修理任务重、修理时间有限、约束复杂的问题,进行了面向定点修理的战时装备维修任务多目标动态调度研究。提出了战时定点修理装备维修任务调度军事问题,考虑修理时间窗、非遍历性等约束,构建了战时装备维修任务多目标动态调度模型。采取分步求解思路处理修理小组分配以及修理任务排序两阶段优化问题,并从状态转移规则、信息素更新规则、先验信息获取3个方面对最大最小蚂蚁系统(max-min ant system,MMAS)算法进行改进,结合变邻域搜索(variable neighborhood search,VNS)算法增强算法的局部搜索能力,设计了基于Pareto改进VNS-MMAS算法实现模型求解,并通过示例仿真验证了模型及算法的科学性与有效性。 To deal with the problem of heavy repair tasks,limited repair time and complicated constraints in wartime,the multi-objective dynamic scheduling of the wartime equipment maintenance tasks for fixed-point repairing is studied.The military problem of wartime fixed-point repairing maintenance task scheduling is proposed.Considering the constraints of repair time window and non-traversal,a multi-objective dynamic scheduling model of the wartime equipment maintenance task is constructed.The step-by-step solution is adopted to deal with the two-stage optimization problem of repair team allocation and repair task sorting.The max-min ant system(MMAS)algorithm is improved from three aspects:state transition rule,pheromone update rule and a priori information acquisition.The local search of the variable neighborhood search(VNS)algorithm is combined with the enhanced algorithm.Based on the ability,the model solving algorithm based on Pareto improved VNS-MMAS is designed.Through example simulation and analysis,the rationality and effectiveness of the model and the algorithm are verified.
作者 刘彦 陈春良 陈伟龙 郭一鸣 LIU Yan;CHEN Chunliang;CHEN Weilong;GUO Yiming(Department of Technical Support Engineering, Academy of Army Armored Force, Beijing 100072, China;Academy of System Engineering,Academy of Military Sciences, Beijing 100141, China;China Satellite Maritime Tracking and Control Department, Jiangyin 214431, China)
出处 《系统工程与电子技术》 EI CSCD 北大核心 2020年第2期356-364,共9页 Systems Engineering and Electronics
关键词 定点修理 多目标 动态调度 修理时间窗 fixed-point repairing multi-objective dynamic scheduling repair time window
分类号 E917 [军事]
  • 相关文献

参考文献11

二级参考文献53

  • 1张芳玉,高崎,何鹏,赵广瑞.战时装备维修任务指派模型及算法研究[J].运筹与管理,2006,15(1):62-65. 被引量:22
  • 2甘茂治 康建设 高崎.军用装备维修工程学[M].北京:国防工业出版社,2001.238-250.
  • 3Roger Cline.Maintenance scheduling for mechanical equipment[OL].United states department of the interior bureau of reclamation,Denver,Colorado.http:// www.usbr.gov/power/data/fist/ fist4_1a/ 4-1a.pdf,2006.
  • 4Roger Cline.Maintenance scheduling for electrical equipment[OL].United states depart-ment of the interior bureau of reclamation,Denver,Colorado.http:// www.usbr.gov/power/data/fist/fist4_1b/fist4_1b.pdf,2006.
  • 5Daniel Frost,Rina Dechter.Maintenance scheduling problems as benchmarks for constraint algorithms[OL].http://www.ics.uci.edu/ -csp/r70b-maintscheduling.pdf.
  • 6王荣辉.战时维修任务指派模型研究[C]//应用高新技术提高维修保障能力会议论文集,2005:719-721.
  • 7Antonio J Conejo,Raquel García Bertrand.A case study in scheduling maintenance of electric power units[DB/OL].http://www.usbr.gov/ power/ data/ fist/ fist4_1a/ 4-1a.pdf,2006.
  • 8Zuo Yan Gu Hanyu Xi Yugeng.Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck[J].Journal of Systems Engineering and Electronics,2007,18(3):556-565. 被引量:21
  • 9Talbot F B. Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: the Nonpreemptive Case[J]. Management Science,1982,28(10): 1197-1210.
  • 10Kis T. A Branch-and-Cut Algorithm for Scheduling of Projects with Variable-Intensity Activities[J]. MathematicalProgramming,2005,103:515-539.

共引文献141

同被引文献48

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部