期刊文献+

8.8 m超大采高综采工作面初次强制放顶技术 被引量:4

Research on the primary forced caving technology of fully mechanized face with 8.8 m super large mining height
在线阅读 下载PDF
导出
摘要 神东公司上湾煤矿12401综采工作面为全世界首个8.8 m超大采高工作面,初采前在工作面切眼范围采取超前深孔预裂爆破的强制放顶措施管理顶板,强制放顶工作主要包括:地面装药、运输、钻孔装药、爆破4个环节,上湾煤矿针对性地制定了相应的安全技术措施,有效地保证了工作面的顺利投产。 The No.12401 fully mechanized mining face in Shangwan Coal Mine of Shendong Company is the first fully mechanized face with 8.8 m super large mining height in the world.Before the mining,the forced caving measures of advanced deep hole pre-splitting blasting were carried out in the open-off cut of working face.The forced caving work mainly includes four links of the ground charging,the transportation,the borehole charging and the blasting.By adopting the corresponding safety technical measures,the safety production of the working face was effectively guaranteed.
作者 翟春宝 吕英华 ZHAI Chun-bao;LYU Ying-hua(Shangwan Coal Mine,Shendong Coal Group Co.,Ltd.,Ordos 017209,China;Geological Survey Branch,Shendong Coal Group Co.,Ltd.,Ordos 017209,China)
出处 《陕西煤炭》 2020年第1期99-103,共5页 Shaanxi Coal
基金 国家“十三五”重点研发计划项目(2017YFC0804310)
关键词 超大采高 开切眼 强制放顶技术 安全措施 爆破 super large mining height open-off cut forced caving technology safety measures blasting
  • 相关文献

参考文献8

二级参考文献61

共引文献459

同被引文献37

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部