摘要
针对某厂不锈钢生产线脉冲燃烧控制加热炉,对无段流量调节脉冲控制燃烧系统调试前准备工作、脉冲烧嘴调试步骤进行了梳理;对调试时数据测量和后续分析进行了总结,可供类似无段流量调节脉冲加热炉燃烧系统设计和生产使用时参考。
Aiming at the pulse combustion control reheating furnace of stainless steel production line in a factory,the preparation work before the commissioning of the pulse control combustion system without zone flow Regulation and the commissioning steps of the pulse burner are combed;the data measurement and subsequent analysis during the commissioning are summarized.It can provide reference for the design and production of similar pulse control combustion system without zone flow Regulation.
作者
唐龙伟
赵建明
TANG Longwei;ZHAO Jianming(Chongqing CISDI Thermal&Environmental Engineering Co.Ltd.,Chongqing 401122,China)
出处
《工业加热》
CAS
2019年第6期50-53,共4页
Industrial Heating
关键词
无段流量调节
脉冲控制加热炉
燃烧系统
调试
without zone flow regulation
pulse control heating furnace
combustion system
commissioning