期刊文献+

大南湖二矿烧变岩台阶采装环节防尘减尘方案探讨 被引量:2

Discussion on the dust-proof and dust-reducing scheme of the mining loading link of the burnt rock step in the Dananhu No.2 Mine
在线阅读 下载PDF
导出
摘要 针对大南湖二矿火烧区烧变岩的特性、露天矿开采工艺,分析了火烧区剥离台阶产尘原因,研制了适合于大南湖二矿粉尘防治的高校抑尘剂,提出了预先在爆堆上洒水进行防尘减尘、采装作业的同时进行喷雾防尘减尘方案。该方案的实施降低了采装过程粉尘的产生。 In that light of the characteristics of the burnt rock of the burning area of the Dananhu No.2 mine,the mining process of the open-pit mine,the cause of the dust generation in the burning zone is analyzed,a dust suppressant for colleges and universities suitable for dust prevention and control in Dananhu No.2 Mine has been developed,Proposed in advance sprinkling water on the blasting heap of dust dust reduction,mining operations at the same time for spray dust reduction plan.The implementation of the scheme reduces the production of dust in the production process.
作者 李超 王梦 赵锦生 范军富 LI Chao;WANG Meng;ZHAO Jin-sheng;FAN Jun-fu(Shenhua Guoneng Nanhu No.2 mine of national energy group,Hami 839000,China;Liaoning Technical University,Fuxin 123000,China)
出处 《世界有色金属》 2019年第19期204-204,206,共2页 World Nonferrous Metals
关键词 露天矿 烧变岩 采装环节 防尘减尘 open-pit mine burnt rock mining loading link dust-proof and dust-reducing
  • 相关文献

参考文献4

二级参考文献5

  • 1GBZ2-2007,工作场所有害因素职业接触限值[S].
  • 2GBZl—2010,工业企业设计卫生标准[s].
  • 3建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程.国家煤炭工业局,2000.
  • 4煤矿防治水规定.国家安全生产监督管理总局,煤炭工业出版社,2009.
  • 5任芸.输煤系统和设备[M].北京:中国电力出版社,2008.

共引文献27

同被引文献90

引证文献2

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部