4Stanton, J. F. and Nakaki, S. D. Design Guidelines for Precast Concrete Seismic Structural Systems[ R] PRESSS Report No. 01/03-09, Department of Civil Engineering, University of Washington, Seattle, 2002
5Cheok, G. S. and Stone, W. C. Perfomance of 1/3-Scale Model Precast Concrete Beam-Column Connections Subjected to Cyclic Inelastic Loads-Report No. 4 [ R]. NISTIR 5436, Building and Fire Research Laboratory,National Institute of Standards and Technology, Gaithersburg, 1994
6El-Sheikh M. Pessiki S. Sause R. Lu L W. Moment Rotation Bbehavior of Unbonded Post-tensioned Precast Concrete Beam-Column Connections[J] ACI structural journal,2000,97(1) :122 - 131
7CSI分析参考手册,Computers and Structures, Inc. Berkeley, California, USA,2004
8Prakash V, Powell G. H. Campbell S. DRAIN-2DX Base Program Description and User Guide, ver 1. 10 [R]. Technical Report, UCB/ SEMM-93/17. Dept. of Civil Engineering, University of California, Berkeley,1993
9Kurama Y, Shen Q. Post-tensioned Hybrid Coupled Walls under Lateral Loads [J]. Journal of Structural Eengineering, American Society of Civil Engineers, 2004,130(2) : 297 - 309.