摘要
推导了深层搅拌桩止水帷幕水泥掺入比计算公式。简要地对比分析了相邻桩之间不同视搭接宽度的两种方案。提出了仅考虑主动土压力作用情况下止水帷幕厚度计算方法。给出了止水帷幕与支护桩之间的距离及桩间土保护措施的建议。
Calculation formula of cement-mixed proportion of curtains for cutting off water in deep-cement-mixing piles is deduced. Two different plans of apparent connection length between near pile are briefly contrasted and analyzed. Calculation methods of thickness of curtain for cutting off water are proposed when only active earth pressure is considered. Suggestions about distance between curtains for cutting off water and protecting piles and about protective measure of soil between piles are given.
出处
《地质与勘探》
CAS
CSCD
北大核心
2002年第6期91-94,共4页
Geology and Exploration
关键词
深层搅拌桩
止水帷幕
水泥掺入比
视搭接宽度
厚度
土压力
支护桩
curtains for cutting off water in deep-cement-mixing piles, cement-mixed proportion, apparent connection length, thickness of curtain for cutting off water