期刊文献+

渝怀铁路歌乐山隧道洞口滑坡段施工技术 被引量:2

Construction Technique for the Landslide Section at the Portal of Geleshan Tunnel of Yuhuai Railway
在线阅读 下载PDF
导出
摘要 渝怀铁路歌乐山隧道出口洞顶位于滑动带 ,且出口段地层为泥夹砂岩 ,设计为V级围岩 ,进洞条件差。本文介绍了通过采用高压旋喷桩加固 ,小导管超前支护 ,超短三级台阶开挖以及监控量测等措施实现了顺利进洞 ,可供同类地质条件下隧道施工时的参考。 The crown of the tunnel at the portal of Geleshan tunnel in Yuhuai railway is situated in landslide zone and the stratum at this section is mudstone-sandstone. The rock designed is of V class. There is a poor condition for the tunnel entry. In this paper the advanced support by small pilot pipes, consolidation with high pressure bored shotcrete pile and extra short excavation on three terraces and monitoring measurement were presented for successful entry. It can serve as reference for similar tunnel construction.
作者 朱泽兵
出处 《地下空间》 CSCD 2002年第4期303-305,共3页 Underground Space
关键词 渝怀铁路 歌乐山隧道 洞口 滑坡 施工技术 V级围岩 portal of Geleshan tunnel landslide V class surrounding rock construction technique
  • 相关文献

同被引文献8

引证文献2

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部