期刊文献+

高温高盐油藏化学堵水技术 被引量:24

CHEMICAL WATER PLUGGING IN HIGH TEMPERATURE AND HIGH SALT RESERVIOR
在线阅读 下载PDF
导出
摘要 论述了高温高盐油藏化学堵水技术的实验室研究和初期现场试验情况。该技术采用一种新型凝胶型堵剂 ,主剂为改性阳离子聚丙烯酰胺 (CPAM) ,交联剂为分子中含有杂环的有机胺。实验室研究表明 ,在最高温度14 0℃、最高矿化度 35× 10 4mg/L的特殊条件下 ,堵剂成胶固化时间为 6~ 2 4h ,并在此范围内可调 ,封堵强度达耐压2 0MPa以上 ,基本满足中原油田高温高盐油藏化学堵水的要求。该技术在初期现场试验中获得成功 ,效果较好。 This article demonstrated study on lab and initial test on site about chemical water plugging in high temperature and high salt reservoir. This technique use a new gel type plugging agent, the main agent is modified CPAM, crosslinker is organic amine. Study on lab shows when the highest temperature is 140℃ and the highest salinity is 35×10 4mg/L, gel forming and curing time for plugging agent is 6~24h and can be adjusted in this scope, strength of plugging is above 20MPa ,which basically meet with requirements of chemical water plugging in high temperature and high salt reservoir in Zhongyuan Oilfield. This technique has get good effect in test on site in initial time .
出处 《石油钻采工艺》 CAS CSCD 北大核心 2002年第5期50-52,共3页 Oil Drilling & Production Technology
关键词 高温高盐油藏 化学堵水技术 油井 高矿化度 凝胶 研究 oil well high temperature high salinity gel water plugging study
  • 相关文献

参考文献3

共引文献36

同被引文献172

引证文献24

二级引证文献126

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部