摘要
三河发电公司二期两台机组脱硫系统在2015年后经过绿改后,环保参数完全满足国家相关环保排放要求。本文对脱硫系统的出力情况,系统的设备耐温情况,浆液循环泵的启动时间等进行分析,并提出了对脱硫系统运行逻辑进行优化方案,实现脱硫系统优化运行的目的。
The second units stage desulphurization systems of Sanhe Power Generation Co., Ltd. have been modified in 2015, and the environment protection parameters have fully met the relevant national environment protection emission requirements. This paper analyzes the output of desulfurizing system, the temperature resistance of equipment, the start up time of slurry circulating pump, and puts forward the optimization scheme of desulphurizing system operation logicto realize the optimization of desulphurizing system operation.
作者
孙奥
SUN Ao(China Shenhua Energy Co.,Ltd. Guohua Electric Power Branch,Beijing 100025,China)
出处
《价值工程》
2019年第23期218-222,共5页
Value Engineering
关键词
脱硫系统出力
耐温
浆液循环泵
备用
output of desulfurization system
temperature resistance
propeller fluid circulationg pump
standby