期刊文献+

PDCA循环在医院岗前培训改进中的应用 被引量:4

Application of PDCA Cycle in the Improvement of Pre-service Training in the Hospital
暂未订购
导出
摘要 目的:改进某医院新员工岗前培训,提高岗前培训总体满意度,为其他医院岗前培训提供借鉴。方法:在2017年该医院岗前培训体系的基础上,遵循PDCA循环思想,2018年实施改进措施,并对比2018年和2017年岗前培训相关指标。结果:2018年新员工岗前培训总体满意度为95.88%,91.58%新员工反映岗前培训收获很大,笔试平均成绩为(93.69±6.42)分,三项指标较2017年均有提高,有统计学意义。结论:经过PDCA循环,改进了该医院岗前培训,但不可否认,研究所用评价方法不够全面,有待完善。 Objective:To improve pre-service training for new employees in a hospital,and to improve the overall satisfaction of pre-service training,and to provide reference for pre-service training in other hospitals. Methods:On the basis of pre-service training system in 2017,following the PDCA cycle idea,our hospital improved the training measures in 2018. This paper compared the relevant indicators for pre-service training between 2018 and 2017. Results:The overall satisfaction rate of new employees’pre-service train. ing was 95.88% in 2018. 91.58%of new employees reflected that they learned a lot from pre-service training. The average score of the written test was 93.69±6.42. These three indicators were significantly higher than those in 2017 with statistical significance. Conclusions: After PDCA cycle,pre-service training in our hospital is improved.
作者 陈晶晶 周洋 Chen Jingjing;Zhou Yang(Medical Affair Department,Children’s Hospital of Nanjing Medical University,Nanjing 210008,China;Personnel Department,Stomatological Hospital,Medical School of Nanjing University,Nanjing 210008,China)
出处 《江苏卫生事业管理》 2019年第7期930-933,共4页 Jiangsu Health System Management
关键词 PDCA循环 医院 岗前培训 满意度 PDCA cycle hospital pre-service training satisfaction
  • 相关文献

参考文献8

二级参考文献39

共引文献58

同被引文献34

引证文献4

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部