期刊文献+

Risk, Contract Management, and Financing of the Gotthard Base Tunnel in Switzerland 被引量:2

圣哥达山底隧道的风险、合同管理和融资
在线阅读 下载PDF
导出
摘要 1. Introduction With the opening ceremony of the Gotthard Base Tunnel on 1 June 2016, a new world record was established: the commissioning of the longest railway tunnel in the world. Many challenges have been overcome and many technical innovations have been developed and considered in this project. As of 11 December 2016, the Gotthard Base Tunnel has been an integral part of the new timetable of the Swiss Federal Railways (SBB-CFF-FFS), and is in full operation. With a total length of 57 km and a cruising speed of 200 km·h^-1 for passenger trains, the Gotthard Base Tunnel reduces the journey time through the Alps by 40 min, significantly reducing the distance between the south and north of Europe.
作者 Davide Fabbri
出处 《Engineering》 SCIE EI 2019年第3期379-383,共5页 工程(英文)
  • 相关文献

同被引文献13

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部