摘要
介绍水文地质条件、设计参数、前期审批、施工工艺选择、施工组织方案,探讨施工中遇到的问题及解决措施,进行经验总结。文末附带管道水平定向钻穿越施工视频。
The hydrogeological conditions,design parameters,pre-approval,construction process selection and construction organization scheme are introduced. The problems encountered during construction and the solutions are discussed,and the experience is summarized. The pipeline horizontal directional drilling crossing construction video is attached at the end of the paper.
作者
申粤
乔珩
乔志国
黄俭
SHEN Yue;QIAO Heng;QIAO Zhiguo;HUANG Jian
出处
《煤气与热力》
2019年第5期10028-10030,10046,共4页
Gas & Heat
关键词
大型水平定向钻穿越
非开挖
钱塘江
施工组织
large horizontal directional drilling crossing
trenchless
Qiantang River
construction organization