预制装配式结构在地下污水处理厂工程中的应用 被引量:6

Application of Prefabricated Structure in Underground Sewage Treatment Plant Project
在线阅读 下载PDF
导出
摘要 结合上海白龙港污水处理厂提标改造工程BLG-C3标实践,详细介绍了预制叠合板、预制柱、梁柱预制节点等预制装配式结构在地下污水处理厂工程中的运用。其中,着重对原设计方案的缺点进行了分析,并提出了改进的建议,同时对预制装配式结构的施工工艺进行了总结,以期为今后预制装配式结构工程的施工提供参考。 Combined with the practice of BLG-C3 section for the upgrading project of Shanghai Bailonggang Sewage Treatment Plant, the application of prefabricated composite structure such as prefabricated laminated plates, prefabricated columns and prefabricated joints of beam-column in underground sewage treatment plants project is introduced in detail. Among them, the shortcomings of the original design scheme are emphatically analyzed, and the suggestions for improveme nt are presented. At the same time, the constructio n tech no logy of the prefabricated structure is summarized in order to provide reference for the construction of prefabricated structural engineering in the future.
作者 胡董超 黄飞祥 赵欣 廖志斌 HU Dongchao;HUANG Feixiang;ZHAO Xin;LIAO Zhibin(Shanghai Construction No.2 (Group) Co., Ltd., Shanghai 200090, China;Shanghai Engineering Research Center of Top-Down Method in Construction Engineering, Shanghai 200080, China)
出处 《建筑施工》 2019年第4期684-687,共4页 Building Construction
基金 上海建工集团资助课题(17JCSF-37)
关键词 地下污水处理厂 预制叠合板 预制柱 梁柱预制节点 underground sewage treatment plant prefabricated laminated plates prefabricated column prefabricatedjoint of beam-column
  • 相关文献

参考文献2

二级参考文献27

共引文献176

同被引文献28

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部