期刊文献+

地形坡度对越野机动时间影响分析 被引量:9

Analysis of Influence of Terrain Slope on Off-road Maneuvering Time
在线阅读 下载PDF
导出
摘要 为研究地形坡度对车辆越野机动时间的影响,预测和估计车辆通行时间,采用了数字高程模型(Digital Elevation Model,DEM)来模拟复杂的地貌形态。采用了移动窗口法计算了DEM格网单元的坡度,建立数学模型研究了地貌对车辆越野机动的速度影响系数,包括两方面:坡度引起路线延长和坡度影响车辆自身速度。通过实例分析计算了车辆通行时间,该方法为准确研究车辆越野机动通行时间提供了理论依据和参考。 In order to study the effect of slope on Off-road maneuver of the vehicle,to predict and evaluate the vehicle's moving time,Digital Elevation Model(DEM)is used to simulate the complex relief structure.In this paper,we adopt the moving window method to calculate the slope of DEM grid unit,and present the mathematical model to research the deceleration coefficient of relief to Off-road maneuver of the vehicle,which includes two parts,the extended road caused by the slope and the speed of the vehicle.Experimental results provide theoretical reference for researching the vehicle's moving time on Off-road maneuver.
作者 袁仁进 陈刚 王冰冰 YUAN Renjin;CHEN Gang;WANG Bingbing(Institute of Geospatial Information, Information Engineering University, Zhengzhou 450001, China)
出处 《地理信息世界》 2017年第6期87-91,共5页 Geomatics World
关键词 越野机动 数字高程模型 坡度 格网单元 Off-road maneuver digital elevation model (DEM) slope grid unit
  • 相关文献

参考文献3

二级参考文献22

  • 1刘学军,龚健雅,周启鸣,汤国安.基于DEM坡度坡向算法精度的分析研究[J].测绘学报,2004,33(3):258-263. 被引量:163
  • 2陈楠,林宗坚,李成名,朱红春,徐增让,汤国安.基于信息论的不同比例尺DEM地形信息比较分析[J].遥感信息,2004,26(3):5-9. 被引量:26
  • 3汤国安,赵牡丹,李天文,刘咏梅,谢元礼.DEM提取黄土高原地面坡度的不确定性[J].地理学报,2003,58(6):824-830. 被引量:182
  • 4[1]LIU Xue-jun.On the Accuracy of the Algorithms for Interpreting Grid-based Digital Terrain Model [D].Wuhan:Wuhan University,2002.(in Chinese)
  • 5[2]SKIDMORE A K.A Comparison of Techniques for the Calculation of Gradient and Aspect from A Grided Digital Elevation Model[J].International Journal of Geographical Information Systems,1989,(3): 323-334.
  • 6[3]FLORINSKY I V.Accuracy of Local Topographic Variables Derived from Digital Elevation Models[J].Int J Geographical Information Science,1998,12(1): 47-61.
  • 7[4]CHANG K,TSAI B.The Effect of DEM Resolution on Slope and Aspect Mapping[J].Cartography and Geographic Information Systems,1991,18: 69-77.
  • 8[5]BOLSTAD P V,STOWE T J.An Evaluation of DEM Accuracy: Elevation,Slope and Aspect [J].Photogrammetric Engineering and Remote Sensing,1994,60:1 327-1 332.
  • 9[6]HODGSON M E.What Cell Size Does the Computed Slope/Aspect Angle Represent? [ J].Photogrammetric Engineering and Remote Sensing,1995,61: 513-517.
  • 10[7]JONES K H.A Comparison of Algorithms Used to Compute Hill Slope as a Property of the DEM [J].Computer and Geosciences,1998,24 (4): 315-323.

共引文献179

同被引文献93

引证文献9

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部