摘要
以某波形钢腹板斜拉桥为工程背景,建立实体有限元模型及杆系模型,在有限元计算分析的基础上,对主要施工阶段及成桥阶段关键截面的剪力滞进行分析。通过分析发现:主梁施工过程中剪力滞效应较明显,其中斜拉索锚固区的剪力滞系数最大,内腹板的剪力滞系数大于中腹板及外腹板的剪力滞系数;与施工过程相比,成桥阶段的剪力滞效应不太明显且底板剪力滞效应弱于顶板。针对主梁剪力滞效应的特点,应充分考虑该类主梁剪力滞效应的影响,建议在运用杆系分析程序对该类型箱梁总体设计时,应考虑设置剪力滞效应的影响,尤其是集中荷载作用位置。
Based on a corrugated steel web cable-stayed bridge as an engineering background,solidfinite element model and the truss model were established. Based on finite element analysis,the shearinglag effects were analyzed with the main construction stage and key cross section,through the analysis itwas found that the shearing lag effect in the process of the main girder construction was obvious,theshearing lag coefficient of the anchorage cable area was the largest,and the shearing lag coefficient of theinternal web was larger than that of the middle and the external web;Compared with the constructionprocess,the shearing lag effect of bridge formation was not obvious and the baseplate was weaker than theroof. According to the characteristics of the girder shearing lag effect,we should consider the effect of thiskind of shearing lag effect of girder fully,and the stress safety factor should be taken into considerationwhile designing this type of box girder with truss analysis program.
作者
张若钢
贺超
戴杰吉
谢瑛
ZHANG Ruogang;HE Chao;DAI Jieji;XIE Ying(China Railway Bridge Science Research Institute Ltd.,Wuhan 430034,Hubei,China;School of Civil Engineering and Architecture,Hubei University of Technology,Wuhan 430068,Hubei,China)
出处
《江汉大学学报(自然科学版)》
2016年第3期275-281,共7页
Journal of Jianghan University:Natural Science Edition
关键词
波形钢腹板
剪力滞
仿真分析
力学性能
corrugated steel web
shearing lag effect
simulation analysis
mechanical property