期刊文献+

惠宁输油管道增输改造工艺的优化设计 被引量:2

Optimized Design on Oil Throughput Stimulation Process in Hui'anbao-Zhongning Oil Pipeline
在线阅读 下载PDF
导出
摘要 介绍了惠安堡一中宁输油管道进行增输改造的4种工艺方案,对各种技术方案进行了比较。通过经济评价,优选出了最经济的换管增输方案,并结合设计方案,提出了该增输改造工程主要输油设备的选型。 Hui'anbao-Zhongning Oil Pipeline was put into operation in 1978 with a total length of 164 km and 325 mm in diameter,the design pressure was 6.27 MPa,and the design capacity was 400×10~4 t/a. According to a long-term transportation program,the transportation capacity of the pipeline will be increased from current 218. 5×10~4 t/a to 550×104 t/a in 2005. To achieve it,four stimulation programs are worked out. Through an economy evaluation, the optimized stimulation program (pipe displacement to increase oil throughput) is determined. Combining the design program,the number of main pumping sets are also de- termined.
出处 《油气储运》 CAS 北大核心 2002年第9期7-10,共4页 Oil & Gas Storage and Transportation
关键词 惠宁输油管道 增输改造 工艺 优化设计 运行成本 oil pipeline,throughput stimulation,transportation process ,operational cost,optimal design
  • 相关文献

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部