摘要
介绍了武汉石油化工厂 75t/h全燃石油焦循环流化床锅炉运行中存在的问题 。
The existing problems during operation of 75t/h petroleum coke fired circulating fluid bed boiler in Wuhan petrochemical plant are recommended.The reformation assumtion and specific plan are proposed.
出处
《石油化工设备技术》
CAS
2002年第5期32-34,共3页
Petrochemical Equipment Technology
关键词
循环流化床燃焦锅炉
技术改造
石油焦
水冷旋风分离器
Circulating fluid bed boiler
Petroleum coke
Water cooling cyclone
Boiler reformation