摘要
借助大量的试验 ,通过对影响苏制 K- 2 1 5 - 1 30 - 1型汽轮发电机组 2号瓦温度诸多因素的分析 ,对此提出了改进方案。
Basing on the test datum,it analyzed the temperature higher reasons of No.2 bearing on the 215 MW steam turbine set which made in former Soviet,gave improvement methods.
出处
《山西电力》
2002年第4期11-13,共3页
Shanxi Electric Power