初支连拱二衬独立式区间结构隧道施工质量控制要点 被引量:7

KEY POINTS FOR CONSTRUCTION QUALITY CONTROL OF INITIAL SUPPORT MULTI-ARCH SECONDARY LINING INDEPENDENT INTERVAL TUNNEL
在线阅读 下载PDF
导出
摘要 北京地铁16号线起点–北安河站区间地下初支连拱二衬独立式区间结构隧道施工中,考虑结构特点和施工方法,从测量放线、控制中隔壁位置、控制洞身开挖尺寸、钢架安装精度、锁脚锚管(杆)、喷射混凝土强度、背后回填注浆等方面制定施工质量控制要点,保证了结构稳定和施工安全。 Considering the structural characteristics and construction method of underground initial support multi-arch secondary lining independent interval structure tunnel of Beianhe Station, which is the origin station of Beijing subway line 16, key points for construction quality control were established on the aspects of measuring line paying off, middle wall position control, hole excavation size control, steel frame installation accuracy, end locking anchor pipe (rod), sprayed concrete strength, rear backfill grouting. Structural stability and construction safety were successfully guaranteed.
作者 柴峰 CHAI Feng(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处 《建筑技术》 2018年第11期1185-1188,共4页 Architecture Technology
关键词 地铁工程 初支连拱二衬独立式区间 质量控制 subway project initial support multi-arch secondary lining independent interval quality control
  • 相关文献

参考文献2

二级参考文献4

  • 1东、中、西日本高速道路株式会礼.设计要领(隧道)[S].第3集.[S.1.]:东、中、西日本高速道路株式会社,2014.
  • 2East/CentraL'West Nippon Expressing Company 1,imited. Construction management points of tunnel L S ]. [ s. 1. ~ : East/Central/West Nippon Expressing Company I,imited, 2013. ( in Japanese).
  • 3Norwe~an Tunnelling Society. Non,~egian tunnelling lechnolog.~ [ MI. Sandvika: Norwegian Tunnelling Society,2014.
  • 4Kimo Chi. Study on new technologies (i. c. girder) [ J ]. Tunnel and Underground,2011 (42) : 12. ( in Japanese ).

共引文献14

同被引文献40

引证文献7

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部