摘要
确定临沂±800 kV换流站与智圣500 kV变电站站用电系统采用合建方案,对合建站用电系统的初始和最终状态接线进行描述,结合两站建设时序提出了推荐的过渡接线方案。
The combined construction scheme of station using electricity system of Linyi -+800 kV converter station and Zhisheng 500 kV substation station is designed.The initial and final state circuit of station using electricity system is described, Combining the timing of two stations construction, the transitional scheme is proposed.
作者
汪斌
慕德凯
吴遨
苏炜
周佳宾
WANG Bin;MU Dekai;WU Ao;SU Wei;ZHOU Jiabin(East China Electric Power Design Institute Co.,Ltd.,Shanghai 200001,China;State Grid Rizhao Power Supply Company,Rizhao 276826,China;Shandong Electrical Power Supply & Transformation Engineering Co.,Ltd.,Jinan 250118,China;State Grid Shandong Electrical Power Construction Company,Jinan 250001,China)
出处
《山东电力技术》
2018年第9期34-37,共4页
Shandong Electric Power
关键词
电气工程
±800
kV换流站
站用电系统
合建
electrical engineering
+ 800 kV converter station
station power system
combined construction