期刊文献+

长河坝水电站500 kV电缆耐压试验方案研究 被引量:8

Study on 500 kV Cable Withstand Voltage Test Plan of Changhe Dam Hydropower Station
在线阅读 下载PDF
导出
摘要 长河坝水电站500 kV气体绝缘母线(gas insulated busbar, GIB)和电缆具有容量大、电压高等特点,交流耐压试验难度较大。为了检查电缆安装后的绝缘性能是否良好,检验是否存在绝缘隐患(如安装错误,包装、运输、储存和安装调试中的损坏等)导致的绝缘故障。本文通过合理地安排试验步骤,对500 kV电缆进行交流耐压试验,有利于缩短试验周期,减小技术和安全风险,并在被试验设备或试验设备发生损坏情况下,留有足够的检修时间和条件,节约大量工期,更具实际意义,值得在实际施工过程中推广应用。 The 500 kV GIS and cable of Changheba Hydropower Station have the characteristics of large capacity and high voltage, so AC withstand voltage test is difficult. In order to check the insulation performance of the cable after installation is good, check whether there are hidden insulation faults (such as installation errors, packaging, transportation, storage and installation and debugging damage, etc.) caused by insulation faults. In this paper, the AC withstand voltage test of 500 kV cable is carried out by arranging the test steps reasonably, which is beneficial to shorten the test period, reduce the technical and safety risks, and leave enough maintenance time and conditions when the test equipment or test equipment is damaged, thus saving a lot of construction time. It is worth popularizing in the actual construction process.
作者 杜鹏 杨东波 DU Peng;YANG Dong-bo*(Zhejiang Huadong Engineering Consulting Co.,Ltd,Hangzhou,Zhejiang 311122)
出处 《新型工业化》 2018年第8期31-33,共3页 The Journal of New Industrialization
关键词 500KV电缆 交流耐压 试验方案 500kV cable AC withstand voltage Test scheme
  • 相关文献

参考文献8

二级参考文献35

共引文献45

同被引文献58

引证文献8

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部