Strategies of "Power-off Reset" Failure for Siemens MM440 in the Application of Gas Press

Strategies of "Power-off Reset" Failure for Siemens MM440 in the Application of Gas Press
在线阅读 下载PDF
导出
摘要 Gas pressurized fan speed control and remote monitoring was achieved based on three sets of gas pressure MM440 frequency converter control system, through the Profibus-DP network transmission of exchange data and signal instructions. In operation, one converter which adopted " power-off reset" has broken down, so as to cause two other gas pressurized frequency converter tripping. This paper proposed method to achieve capture and process failures, and application to converter control system. The result shows that the present method solves the fault, improves the system operation stability and meets the requirement of production. Gas pressurized fan speed control and remote monitoring was achieved based on three sets of gas pressure MM440 frequency converter control system, through the Profibus-DP network transmission of exchange data and signal instructions. In operation, one converter which adopted " power-off reset" has broken down, so as to cause two other gas pressurized frequency converter tripping. This paper proposed method to achieve capture and process failures, and application to converter control system. The result shows that the present method solves the fault, improves the system operation stability and meets the requirement of production.
出处 《International Journal of Plant Engineering and Management》 2018年第3期179-185,共7页 国际设备工程与管理(英文版)
关键词 gas press frequency converter electronic control network composition gas press frequency converter electronic control network composition
  • 相关文献

参考文献2

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部