摘要 某斜拉桥为混凝土梁+钢混组合梁的形式,上部结构边、中跨采用非对称平衡体系,通过采用对称悬拼施工与非对称悬拼施工方法比较,对于结构复杂的非对称平衡体系斜拉桥,需辅以临时支撑等措施,以减小塔顶偏位,对同类型桥梁施工具有指导意义。 A cable-stayed bridge is composed of concrete beam and steel-concrete composite beam. The superstructure side and middle span are constructed with asymmetrical balanced system. By comparing the construction methods of asymmetrical cantilever construction and asymmetrical cantilever construction, for cable-stayed bridges with complex asymmetrical balanced system, temporary support is needed to reduce the tower top deviation, which is of guiding significance for the construction of the same type of bridges.
作者 戚原 向伟 QI Yuan;XIANG Wei(Chongqing Yufu Land Development and Management Co.,Ltd.,Chongqing 400000,China;Sichuan College of Architectural Technology,Deyang 618000,China)
出处 《价值工程》 2018年第19期107-108,共2页 Value Engineering
关键词 斜拉桥 非对称平衡体系 悬拼施工 cable-stayed bridge asymmetrical balanced system cantilever construction
  • 相关文献

参考文献3

二级参考文献6

共引文献36

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部