摘要
重点探讨使用计轴作为列车占用检测设备的地铁正线车站、车辆段及停车场,是否均需设置轨道停电监督功能,并简述设置轨道停电监督的方案。
We focus on discussing how to use axle counter as train occupancy detection equipment at main line station, car depot and parking lot in metro and whether to set the function of track power failure supervision. In addition, the scheme of track power failure supervision is briefly de- scribed.
出处
《铁道通信信号》
2018年第4期44-45,共2页
Railway Signalling & Communication
关键词
地铁车站
计轴
轨道停电监督
计算机联锁系统
Metro station
Axle counter
Track power failure supervision
CBI system