期刊文献+

江西洪屏抽水蓄能电站励磁系统的研究及应用 被引量:5

Design and Application of the Excitation System in Jiangxi Hongping Pumped Storage Power Station
在线阅读 下载PDF
导出
摘要 针对江西洪屏抽水蓄能电站300 MW机组励磁系统控制功能和各主要组成装置的设计原则,江西洪屏抽水蓄能电站励磁系统机电设备通过安装、调试、试验,各性能指标均达到并优于国家标准,符合设备合同要求和相关技术条款的规定,满足了运行要求。洪屏抽水蓄能电站首台机组投入运行,实现了江西电网抽水蓄能零的突破,在区域电网中开始发挥"稳压器""蓄电池""调节器"的作用。 The design and application of the excitation system for the 300 MW generator units in Jiangxi Hongping Pumped Storage Power Station are presented. Specifically, the design principles of the control functions and main components are introduced. After the installation, commissioning and testing, the performance parameters of the electro-mechanical devices in the excitation system are all superior to the national standard, contract requirements and relevant technical provisions. Thus, the operation requirements of the system are satisfied. The success operation of the first unit in Hongping Pumped The power station Storage Power Station is a memorable breakthrough of pumped storage in the Jiangxi power grid. begins to play its role of the stabilizer, battery and regulator in the regional power grid.
出处 《水电与新能源》 2018年第1期61-67,共7页 Hydropower and New Energy
关键词 抽水蓄能 励磁系统 设计原则 pumped storage excitation system design principle
  • 相关文献

参考文献1

二级参考文献9

  • 1陈贤明,王伟,刘国华.水轮发电机灭磁电阻的选择[J].水电自动化与大坝监测,2007,31(4):12-16. 被引量:4
  • 2DL/T5208--2005抽水蓄能电站设计导则[S].2005.
  • 3GB1094.5—2003电力变压器第5部分:承受短路的能力[S].2003.
  • 4GB/T17468—1998电力变压器选用导则[S].1998.
  • 5GB/T7409.3—2007同步电机励磁系统:大中型同步发电机励磁系统技术要求[S].2007.
  • 6IEC61378—1—1997变流变压器第1部分:工业用变流变压器[S].1997.
  • 7DL/T583--2006大中型水轮发电机静止整流励磁系统及装置技术条件[S].2006.
  • 8ANSI/IEEE C37. 18--1979 (R2003) IEEE standard enclosed fiele discharge circuit breaks for rotating electric machinery[S]. 1979.
  • 9黄耀群 李兴源.同步电机现代励磁系统及其控制[M].成都:成都科技大学出版社,1998..