MGSE二期工程EPC总承包项目设计变更研究 被引量:1

Study on the Design Changes of EPC General Contract Project for MGSE Phase 2
在线阅读 下载PDF
导出
摘要 设计工作贯穿工程项目的全过程,是EPC总承包项目的基础,在总承包阶段,由于会受到各种不可控因素的影响,对于项目前端设计或基本设计的更改不可避免。论文对MGSE二期项目中发生的燃气增压站管线最大允许运行压力变更和主管线连接方式,由热开孔变为冷开孔施工进行了介绍和研究,为后续受变更影响部分设计工作的完成提供了参考。 The design work which exists throughout the project is the basis of the Engineering, Procurement and Construction general contract. During every stage of the general contract, the project will be influenced by variously uncontrollable events which will lead to the unavoidable change of the Front End Engineering Design or Basic Design. This study introduces the design changes of Maximum Allowable Operating Pressure in the pipelines of Booster Gas Compression Station and the pipeline connection ways changing from hot tap construction to cold tap construction happened in Master Gas System Expansion(MGSE)Project Phase 2. The analyses of this study will be a reference to help finalize the subsequent design work influenced by the design changes.
出处 《工程建设与设计》 2017年第19期216-219,共4页 Construction & Design for Engineering
关键词 国际EPC总承包 设计变更 燃气增压站 international EPC general contract design change booster gas compression station
  • 相关文献

参考文献10

二级参考文献34

共引文献149

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部