期刊文献+

近距离外错布置巷道煤柱注浆加固技术应用

Application of Coal Pillar Grouting Reinforcement Technique in Short Distance and Out of Way Tunnel
在线阅读 下载PDF
导出
摘要 针对山西某煤矿近距离煤层开采过程中,下层1808综采工作面采用外错方式布置,辅运巷煤柱在压力作用下局部片帮、变形严重,严重影响了井下设备运输并且威胁到巷道的安全。因此,对1808辅运巷煤柱的破坏变形区域进行了注浆加固,有效地提高了煤柱的稳定性及巷道的通过性,保证了巷道的安全。 According to a Shanxi Coal Mine close during coal mining,1808 fully-mechanized face used the wrong way lower layout. The auxiliary coal pillar is under pressure,deformation is serious,it serious impact on the underground transportation equipment and threaten the safety of roadway. Therefore,in this paper,the 1808 auxiliary transport crossheading pillar deformation,the scheme design of grouting reinforcement,through the implementation of grouting reinforcement and damage parts of the coal pillar,effectively improve the stability of roadway and coal pillar by nature,to ensure the safety of the roadway.
作者 李旭东
出处 《煤》 2017年第10期23-25,共3页 Coal
关键词 近距离开采 煤柱 注浆加固 short distance mining coal pillar grouting reinforcement
  • 相关文献

参考文献6

二级参考文献46

共引文献231

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部