摘要
桥梁工程施工过程中,现浇满堂支架施工法是最常用的一种施工方法。同时,满堂支架施工也是现浇箱梁过程中的基础环节,支架的强度、刚度、稳定性及基底承载力等对工程的施工质量有着直接的影响。文章以实际工程为例,对现浇满堂支架的施工方法进行了分析,施工完成后进行了支架预压试验,确保了满堂支架施工质量。
The cast-in-situ full framing construction method is the most common construction method in the bridge engineering construction process.At the same time,the full framing construction is also the foundation link in the cast-in-situ box beam process.The framing strength,rigidity,stability and base bearing capacity will directly influence the engineering construction quality.Taking a practical project as an example,the article analyzes the construction method of cast-in-situ full framing.The framing pre-compaction test is carried out after the construction in order to ensure the construction quality of full framing.
出处
《城市道桥与防洪》
2017年第10期99-101,共3页
Urban Roads Bridges & Flood Control
关键词
现浇满堂支架
立杆垫板铺设
压载试验
cast-in-situ full framing
vertical rod gasket laying
ballasting test