双向变截面钢箱梁顶推工法的应用 被引量:7

Application of jacking construction of variable cross-section steel box girder
原文传递
导出
摘要 本文以珠海市横琴新区双向变截面、双向纵坡的钢箱梁斜拉桥的施工为例,详细介绍了斜拉加劲连续钢箱梁桥进行顶推施工的方案比选、前期准备、顶推流程、注意事项及钢箱梁落梁等,为同类钢箱梁桥的顶推施工提供参考。 Incremental launching method owns broad prospect because its safety, convenience, little inference with local environment, less occupied and other advantages. In this paper, the construction of a cable-stayed bridge with a two-way variable cross-section steel box girder in Hengqin district,Zhuhai was taken as the example. The preliminary preparation,the pushing process,the precautions and the box girder beam installation were introduce in detail, thus references were provided for similar bridge projects.
作者 楚兴华 Chu Xinghua(Zhuhai Da Heng Qin Company Limited,Zhuhai 519031, Guangdong)
出处 《工程建设》 2017年第8期65-68,共4页 Engineering Construction
关键词 变截面 斜拉桥 钢箱梁 顶推施工 variable cross-section incremental launching method cable-stayed bridge steel box girder
  • 相关文献

参考文献5

二级参考文献1

  • 1范立础.桥梁工程(下册)[M].北京:人民交通出版社,1993..

共引文献52

同被引文献41

引证文献7

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部