研究采用三维模型模拟的方法,通过软件模拟、构建完整的液压支架结构,并对其进行检验。研发的新型支护装置能够在巷道掘进的同时进行支护操作,提高了设备的开机率,缩短了掘进工期。
The method of three-dimensional model simulation research was adopted, and the whole hydraulic support structure was constructed by software simulation and tested. Supporting device research of, can be taken during tunneling, improves the operation rate of equipment,but also greatly reduces the driving time.
作者
胡树安
Hu Shu-an(Xishan coal electricity Limited by Share Ltd XIQu coal Mine,Shanxi Taiyuan 03020)
出处
《山东煤炭科技》
2017年第9期58-60,共3页
Shandong Coal Science and Technology
关键词
液压支架
整体结构
超前支护
三维模拟
受力程度