3[3]Airbus Company.Getting to Grips With Aircraft Performance[Z].Airbus Company,2002
4FAA Proposes Engagement Strategy for NextGen,http: //www.faa.gov/nextgen/strategy/June 3, 2010.
5RICHARD A.Coppenbarger:climb trajectory prediction enhancement using airline flight-planning information[C]//Proceedings of the AIAA Guidance,Navigation,and Control Conference.[S.l.]:AIAA,1999:1077-1087.
6LEE H P,LEFFER M F.Development of the L-1011 fonr-dimensional flight management System,NASACR 3700[R].NASA,1984:1-135.
7陈巧雅.北京管制区域飞行流量仿真原型系统研究与开发[D].北京:清华大学,2004.
8SIPE A, MOORE J. Air traffic functions in the NextGen and SESAR airspace [ C]// Proceedings of the 2009 IEEE/AIAA 28th Digital Avionics Systems Conference. Piscataway: IEEE Press, 2009: 2. A. 6-1 -2. A. 6-7.
9Joint Planning and Development Office. Concept of operations for the next generation air transportation system: joint planning and de- velopment office, version 3.2 [ EB/OL]. [ 2013- 11 - 01 ]. http:// jpe. jpdo. gov/ee/docs/conops/NextGen_ConOps_v3_2, pdf.
10BROOKER P. Simple models for airport delays during transition to a trajectory-based air traffic system [ J]. Journal of Navigation, 2009, 62(4) : 555 -570.