期刊文献+

越南松真2水电站电气二次设计及实施

Electrical Secondary Design and Implementation of Vietnam Songzhen 2 Hydropower Station
在线阅读 下载PDF
导出
摘要 越南松真2水电站位于越南中部地区,其计算机监控系统由北京ABB贝利控制有限公司提供。本文介绍了越南松真2水电站电气二次设计方案及监控系统、继电保护、电站自动化、通信等电气二次设备的主要特点,并对实施情况进行了跟踪,结果表明所有系统运行正常,满足电站安全生产和管理的要求。 Vietnam Songzhen 2 Hydropower Station is located in midland of Vietnam, its computer monitoring and control system is provided by Beijing ABB Bailey Control Co., Ltd. In the paper, main features of electrical secondary design plan, monitoring system, relay protection, power station automation, communication and other electric secondary equipment of Vietnam Songzhen 2 Hydropower Station are introduced. Implementation conditions are traced. The results show that all systems are operated normally, which meet the requirements of power station safety production and management.
作者 张荣梅 ZHANG Rongmei(Power China Huadong Engineering Corporation Limited, Hangzhou 311122, China)
出处 《中国水能及电气化》 2017年第6期40-43,58,共5页 China Water Power & Electrification
关键词 越南松真2水电站 电气设计 Vietnam Songzhen 2 Hydropower Station electrical design

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部