摘要
以江苏财富中心B1项目施工防护升降平台为例,对LPT-01型组合式施工防护升降平台施工存在的技术难点进行分析,包括架体附着问题,层高变化时架体防护问题,46F和47F圈梁附着问题,超长附墙支座安装问题,翻板防护问题,塔式起重机附臂对架体的影响及料台安装问题等技术难点,为后期工程施工提供参考。
This paper introduces construction protection lifting platform of Jiangxi Commercial Union Center project B1,and analysis the difficulties of construction technology of LPT-01 type modular construction protection lifting platform,including the problems of frame body attachment,frame protection during storey height changing,ring beam adhesion of 46F and 47F,long attached to the wall mount installation,plate protection,the influence of tower crane attached arm on frame and feed station installation and so on,which provides reference for later engineering construction.
出处
《施工技术》
CAS
北大核心
2017年第14期66-68,共3页
Construction Technology
基金
住房和城乡建设部科学技术项目基金(2016-K4-070)
江苏省高校自然科学研究面上项目(16KJB610015)
关键词
安装工程
防护
平台
施工技术
数值模拟
分析
installation
protection
platform
construction
simulation
analysis