期刊文献+

库区取水对水利枢纽发电的影响分析——以广州北江引水工程为例

Study on Impact of Water Drawing from Reservoir Area for Water Conservancy Hub Project on Its Power Generation——Taking Guangzhou North River Intake Project as an Example
在线阅读 下载PDF
导出
摘要 以清远水利枢纽坝址处长系列逐日径流为基础,采用水能计算方法计算清远水利枢纽年均发电量,并与实际发电量相比较,误差较小,认为水能计算方法合理;广州北江引水工程取水量依次取1~10 m^3/s,计算其对清远水利枢纽发电效益的影响,计算结果表明广州北江引水工程取水对清远水利枢纽工程发电量影响在44~452万kW·h,占年发电量比例在0.11%~1.1%,且清远水利枢纽电量损失值与广州北江引水工程取水流量基本成正比关系。 Based on the long series daily runoff of Qingyuan Water Conservancy Hub Project, calculates the power generation of Qingyuan Water Conservancy Hub Project with the method of hydropower calculation,Compared with the actual power generation,the error is small,and then the calculation method is reasonable. Analyzes the impact on the power generation of Qingyuan Water Conservancy Hub Project when the intake flow of Guangzhou North River Intake Project is from 1 to 10. The results illustrate that the power loss of Qingyuan Water Conservancy Hub Project is 0. 44 to 4. 52 million kilowatt hours,about 0. 11% to 1. 1% of annual output,and the power loss is proportional to the intake flow of Guangzhou North River Intake Project.
作者 蒋玉玲 张康 JIANG Yuling ZHANG Kang(The Pearl River Hydraulic Research Institute, Guangzhou 510611, China)
出处 《人民珠江》 2017年第6期36-39,共4页 Pearl River
关键词 广州北江引水工程 清远水利枢纽 发电效益影响 水能计算 Guangzhou North River Intake Project Qingyuan Water Conservancy Hub Project impact on power generation hydropower calculation
  • 相关文献

参考文献3

二级参考文献27

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部