在过去很长一段时间内,由于技术的原因,设计人员在线路路径选择过程中需要深入现场开展反复的检验、绘图与计算工作,使输电线路设计的人力物力成本居高不下。现阶段,电力企业以GIS为基础,构建了输电线路三维辅助设计系统,极大地增加了杆塔位置选取等工作的便利。
In the past for a long period of time, due to technical reasons, designer in the line route selection need in-depth on-site to carry out inspection, drawing and calculation work repeatedly, which make the transmission line design cost always high. At present, the electric power enterprise based on the GIS, constructs a 3D CAD system of transmission line, greatly increased the tower location selected work convenience.
出处
《工程建设与设计》
2017年第12期52-53,共2页
Construction & Design for Engineering