期刊文献+

预制装配式结构中预留孔钢筋浆锚搭接的试验研究 被引量:16

EXPERIMENTAL RESEARCH ON REINFORCED ANCHORAGE BY GROUTING IN PREFORMED HOLE OF PREFABRICATED CONCRETE STRUCTURE
原文传递
导出
摘要 提出一种焊接预留孔钢筋浆锚搭接连接技术,通过对36个钢筋浆锚搭接连接试件的拉拔试验,研究其破坏形态、荷载-试件变形曲线以及裂缝发展过程等。试验中,33个试件为钢筋拉断破坏,3个搭接长度为0.3ll的试件发生了锚固破坏,且锚固破坏的试件出现了纵向贯穿劈裂裂缝。研究表明:该连接方式性能良好,可显著减小钢筋搭接长度。 A new connection technique of anchorage rebar by grouting in a preformed grout holes surrouded stirrups with longitudinal reinforcements was designed, and the failure mode, loading-deformation curve and the development processes of cracks were studied through the pull-out tests of 36 grouting anchorage specimens. The research showed that the 33 specimens were rebar fracture failure mode, and the 3 specimens with the lap length of 0.3ll were anchor failure mode. The longitudinal cracks appeared in the 3 specimens were anchor failure mode. The connection technique had good performance in reducing lap length.
出处 《工业建筑》 CSCD 北大核心 2017年第5期68-73,共6页 Industrial Construction
基金 国家自然科学基金项目(51578072) 陕西省自然科学基金(2016JM5070) 陕西省科技统筹创新工程计划项目(2015KTZDSF03-04 2015KTZDSF03-05-01) 西安市科技计划项目(CXY1512(6)) 中央高校基本业务费(310828163410)
关键词 预制装配式结构 浆锚搭接 拉拔试验 搭接长度 prefabricated concrete structure grouting anchorage pull-out test lap length
  • 相关文献

参考文献6

二级参考文献45

  • 1JGJl01-96建筑抗震试验方法规程[S].北京:中国建筑工业出版社,1997.
  • 2YERLICI V A, TURAN O. Factors affecting anchorage bond strength in high -performance concrete [ J]. ACI Structural Journal, 2000,97 (3) :499 - 507.
  • 3ENRICO S, SUCHART L. Responses of reinforced concrete members including bond - slip effects[J].ACI Structural Journal, 2000, 97 (6) : 831 - 839.
  • 4ALMEIDA de F, MENEZES F,DEBS E, et al. Bond - slip behavior of self - compacting concrete and vi- brated concrete using pull - out and beam tests [ J ]. Materials and Structures/Materiaux et Constructions, 2008, 41 (6) : 1073 - 1089.
  • 5WILSON J L, ROBINSON A J, BALENDRA T. Performance of precast concrete load - bearing panel structures in regions of low to moderate seismicity [ J]. Engineering Structures, 2008,30 (7) : 1831 - 1842.
  • 6KURAMA Y C. Precast/prestressed concrete structures under natural and human - made hazards: special issue [ J ]. Journal of Structural Engineering, 2007,133 ( 11 ) : 1487 - 1488.
  • 7MORGEN B G, KURAMA Y C. Seismic design of friction- damped prccast concrete frame structures [J]. Journal of Structural Engineering, 2007, 133 (11):1501 -1511.
  • 8PCa技术研究会.プレキャストコンリ一ト技术マニヱアル[M].东京:株式会社彰国社,2000:38-47.
  • 9渡边邦夫,中野清司.知ちれざるPC建筑[M].东京:株式会社建筑技术,2004:152-171.
  • 10鲤田和夫.最新建篥施工[M].东京:技报堂出版株式会社.2008:82-83.