以国内某电厂~#4超临界机组脱硝改造为例,分析火电机组在脱硝装置改造中对空气预热器产生的影响,并且针对这一问题提出可行的解决措施,为今后国内同类火电机组脱硝装置改造提供经验。
Taking the denitration transformation of No. 4 supercritical unit of a certain power plant in China as an example,this paper analyzed the influence of denitration transformation on air preheater,proposed some feasible countermeasures for the problems,and provided some reasonable experience for the future denitration transformations of similar coal-fired power units.
出处
《华电技术》
CAS
2017年第4期66-67,70,共3页
HUADIAN TECHNOLOGY
关键词
超临界机组
脱硝装置
空气预热器
supercritical unit
denitration device
air preheater