期刊文献+

考虑径流成分的雅鲁藏布江月径流模拟 被引量:5

Simulation of Monthly Runoff Considering Flow Components in Yarlung Zangbo River
在线阅读 下载PDF
导出
摘要 通过构建雅鲁藏布江流域分布式水文模型SWAT,并以1989~1998年为率定期,1999~2005年为验证期对3个水文站(奴各沙、羊村、奴下)的月径流进行了模拟。从模型参数组里选取径流成分模拟不同的2组参数,以Nash-Sutcliffe效率系数(NS)、相关系数(R^2)及相对误差(PBIAS)为评价指标,来分析模型的模拟结果好坏。结果表明:率定期内,在径流成分1下奴各沙、羊村站和奴下站的R^2值高达0.9以上,NS系数分别为0.9、0.92和0.72,PBIAS的值为7.1%、18.5%及34.2%,但径流成分与实际情况出入较大。而径流成分2下,模拟得到的评价指标虽然不是很高,但径流成分比较合理。验证期总体结论一致。因此,建议在模型率定验证中要充分考虑径流成分的作用,从而提高模型模拟的精度。 The semi-distr ibuted hydrological model SWAT was bu i l tfo r th e Yarlung Zangbo River Basin. After calibration (1 989-1998) and vali - dation (1999-2005),the monthly runoff was simulated at three hydrological stations (Nugesha, Yangcun, Nuxia). We selected two sets of parame - ters to analyze the performance of SWAT model through Nash-Sutcliffe Efficiency (NS),determination coefficient ( R2) and relative error (PBIAS). The results show thatfor ParameterSet 1, R 2at three stations were as high as 0.9, NS were 0.9, 0.92 and 0.72, PBIAS were 7 .1%, 18.5% and 34.2% respectively during the calibration. However,the simulations of runoff components are unrealistic. For Parameter Set 2, although the evaluation indexes were not very high,its runoff components are reasonable. This is the same case during the validation. Therefore,it is recommended that the simulation skills of runoff components be considered during model calibration and validation.
出处 《水文》 CSCD 北大核心 2017年第2期26-30,共5页 Journal of China Hydrology
基金 国家自然科学基金资助项目(91547106 51379183)
关键词 SWAT模型 径流成分 流量过程线 雅鲁藏布江 SWAT model runoff component discharge hydrograph Yarlung Zangbo River
  • 相关文献

参考文献6

二级参考文献88

共引文献212

同被引文献81

引证文献5

二级引证文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部