摘要
某工程为保证达到排水需求并满足景观要求,在地下室顶板处将部分区域的砖砌体排水沟做法改进为采用波纹管通长布置的新型景观式排水沟,从而将景观设计与排水沟设计、施工相结合,有效地保证了工程的美感以及排水循环。实践证明,采用新型排水沟施工技术,相比传统的砖砌体排水沟,能有效地缩短工期,降低工程造价,减少施工误差。
In order to ensure the drainage requirements of a project, as well as to meet the landscape requirement, the brick masonry drainage in partial region of basement ceiling has been improved by overall arrangement of new-type landscape drainage with corrugated pipes. Consequently, a combination of the landscape design with the drainage design and construction can effectively guarantee the aesthetic feeling of engineering and drainage circulation. Practice has proved that the construction technology for the new-type drainage, compared with the traditional brick masonry drainage, can effectively shorten the construction period, reduce the engineering cost and minimize the construction error.
出处
《建筑施工》
2017年第3期359-361,共3页
Building Construction
关键词
新型景观式排水沟
砖砌体排水沟
波纹管
施工技术
new-type landscape style drainage
brick masonry drainage
corrugated pipe
construction technology