期刊文献+

红岩河水库泄洪洞挑流鼻坎体型优化试验研究 被引量:3

Research on Shape Optimization of Flip Bucket of Spillway Tunnel for Hongyanhe Reservoir
在线阅读 下载PDF
导出
摘要 挑流鼻坎是常见的泄洪消能工程,在水利工程设计中受到重视。本文针对红岩河水库右岸泄洪洞工程存在水流出向与河道大交角泄洪消能问题,通过水工模型试验对右岸泄洪洞的泄洪消能工程进行试验研究,对挑流消能不同型式进行了对比改善,提出了推荐修改方案,可作为类似工程的参考和借鉴。 Flip Bucket is a common energy dissipation of flood discharge engineering, which is the focus in hydrological engineer- ing design. Aiming at the problem of flow direction of right bank of Hongyanhe reservoir and energy dissipation of channel in- tersection angle of spillway engineering, this paper carried out the research on energy dissipation engineering of spillway tunnel by hydraulic model test, and compared different types of energy dissipation of ski-jump, and put forward modified scheme.
作者 刘冲 张宗孝 陈小威 LIU Chong ZHANG Zong-xiao CHEN Xiao-wei(Institute of Water Resources and Hydro-electric Engineering, Xi'an University of Technology, Xi'an, Shaanxi 710048, China)
出处 《杨凌职业技术学院学报》 2017年第1期1-3,12,共4页 Journal of Yangling Vocational & Technical College
关键词 泄洪洞 水工模型试验 挑流消能 差动坎 扭曲坎 spillway tunnel hydraulic model test energy dissipation of ski-jump hybrid type bucket skew bucket
  • 相关文献

参考文献3

二级参考文献13

共引文献22

同被引文献7

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部