摘要
360°全回转套管机拔桩可广泛应用于废弃桩的处理,本文介绍了在拔桩过程中遇到的难点及处理措施,提供了较全面的施工经验。
The 360° full rotary casing machine pile driving can be widely used in the treatment of abandoned piles. This paper introduces the difficulties encountered in the process of pulling out piles and the treatment measures, and provides a more comprehensive construction experience.
出处
《价值工程》
2017年第3期165-167,共3页
Value Engineering
关键词
360°全回转
桩基拔除
处理措施
应用
360° full rotary
pile foundation removal
treatment measures
application