摘要
在“山高坡陡 ,地势起伏”的山区地段进行管道敷设施工具有一定的难度。文章以兰成渝输油管道第十标段为例 ,介绍了在山区伴行路地段和台田地段挖沟、布管。
It is difficulty to Lay pipeline in mountain area of mountain high slope steep, road narrowly ground slippery '. Taking Lanchengyu 10th mark section of petroleum pipeline for example, the construction methods of diging ditch, lying pipe and welding in the companion trip road section and field section of mountain area have introduced.
出处
《石油工程建设》
北大核心
2002年第4期25-26,共2页
Petroleum Engineering Construction